Detailed result sets at a click of a button, easy and clearly
As a strategic and operational planning, performance, and managing tool, our Tool Suite supports economic IT-management perfectly. Complete transparency of all relevant factors establishes a solid basis for an up front decision making. Comprehensive analysis, benchmarking, simulations and numerous metrics allow traceability at any time and ensure the successful completion of any IT project.
 
Within a short time our Cost Xpert Tool Suite provides reliable results by clicking a button:
  • Project Scope
  • Total Effort and Total Schedule
  • Labor Distribution Costs
  • Total Labor Costs
  • Wage Inflation
  • System Integration Costs
  • Final Costs
  • Work-Breakdown-Structure (WBS) and Schedule
  • Resource Consumption Plan with Utilization and Peak
  • Funding Requirements
  • Potential Project Risks with declaration of Tolerance Threshold and their Sensitivity
  • Identification and distinction of potential Defects
  • Maintenance details
  • Deliverables and Scope
 
Overview Final Costs
 
Work-Breakdown-Structure
 
Resource Consumption Plan
 
In addition, the Cost Xpert Tool Suite offers an extensive benefit in the area of requirements management. Even constantly changing requirements and project conditions can be immediately integrated into the estimation process. This enables rapid updating of all data, figures and plans allowed at this point of time by pressing a button. The high flexibility ensures the initial estimation and during project run.
 
The integrated analysis and visual representation of all relevant factors, provides a valuable support for effective communication and a solid basis for economic decisions. All data and results are displayed automatically, easy and time saving in clear reports. The gained transparency allows for integrated process and project optimization and shows far-reaching potential for sustainable productivity and efficiency.
 
IME provides a transparent and secure basis for planning and decision across the entire lifecycle.

Copyright © 2011 Cost Xpert AG